How To Finish Your Home Interior Project Flawlessly with Balaji Construction.
It's just a house if you don't have a sense of style, and you won't be as comfortable as you could be. Plan your home interiors in a way that is comfortable for you before moving forward. Your living space should be the right blend of style & function. A common problem with the interior design method is not knowing where to begin and there is no sequential order for the execution of proper interior design. It is very helpful that you plan your home with an interior design company like Balaji Construction, which is backed by a team of experts. You can achieve the highest results with us. Making the final finish, however, involves several step-by-step processes. Here's where the sequential interior design process comes into play.
Work on the Structure
To build a coherent and strong house, the underlying work in the interior plan execution phase is to assemble a solid foundation, wall construction & roof work. A house structure is like the skeleton of the body, so it must be designed properly.
Work in the Electrical Industry
There are many types of central wiring for power distribution & lighting in houses. Electricity lines will be determined in this step. Your home's wiring, switchboards, and power sockets will be installed according to your needs. Interior design is heavily dependent on electrical.
The Plastering of the Walls
After routing electrical cables, we are now ready for painting, the next step in our process. Finishing the visual aspects of the wall with cement plaster. This step also requires cutting the brickwork.
Work in the Plumbing Industry
Once the plaster is complete, we will move on to the plumbing. This involves installing the household's pipes, taps, and tanks. To get the right positioning of pipes, you need to start the plumbing work after the plastering work is finished, not before. In a wall with brickwork that is not well levelled, some bricks may project out or some may be drawn inwards.
Putting Putty to Work
Putty work is an introductory step that guarantees the longevity of paint, which is why it comes before painting. Make sure that all plumbing and electrical works have been completed & that no brickwork cutting is required in the future. If not, some markings in the wall won't be exactly finished. So check thoroughly in advance. Applying wall putty slows the deterioration of your walls. Abrasion, water, heat, and shedding are also prevented by it. Putty is available in many varieties on the market. Always consult a professional.
Work on the Sanding and Primer
Prior to painting, consider sanding, priming, and other prepping approaches that will help your project proceed smoothly and ultimately end with a spectacular result. Sand between coats with coarse grit sandpaper, then medium grit sandpaper, and finally fine-grit sandpaper. In addition, a primer will make the topcoat more durable and solid. Putty quality must be ensured during this time
Installation of Ceilings
Is it surprising to see false ceiling work before floor work? Most people do flooring before ceilings. This interior design mistakes. As a result of moving tools and appliances needed for ceiling work, various bumps and marks are caused in floors
Work on the Flooring (tile work).
The ceiling must be painted after this step. Especially when ladders rest on the floors when you fix your ceiling & paint work, you might get dust & damage on the floors.
The ceiling, most of the painting & prep work should be done before the flooring to avoid damaging the floors. Construction of the floor involves installing a permanent casing.
Floor design plays an integral role in planning the interiors of a home & completes the overall theme.
Colouring of the First Coat
The next step is to apply the first coat of paint to the surface. Please keep in mind that here we are only doing the first coat of painting, and we will have to complete the actual interior designing work like cabinetry, carpentry, furniture, false ceiling lighting, etc. after that. The freshly painted walls are likely to get dirty, dusty after all these interior works after the final painting.
Work in the Field of Furnishing
After the first coat of colour is applied, electrical work, including fixing switches, and carpentry, such as kitchens and woodwork, begins. In this step, you can choose home accessories & furniture. In addition, you can choose faucets and other plumbing fixtures for your bathroom well in advance. However, you don't have to wait until all the above-mentioned steps have been completed. With proper plans & designs, furniture can be produced in parallel with the initial work.
The Final Colouring of the Coat
We have completed the electrical, carpentry, and plumbing work, so now we can paint the final coat. This step includes everything from painting to wallpaper installation. Before proceeding with the final coat of colouring, we need to mask to protect the surfaces of cabinets and other decor items.
Joints Between Tiles that Need to be Filed or Grouted
The final step is to fill in the joints and unite your floor. It is not necessary to do this step only at the end; it can be done during furnishing or tile work as well. We at Balaji Construction put this at the end, so that no dust or stains will occur in the tile joints once all interior works are completed. This will also ensure that the site is free. Finally, you will have a neat, clean & organized space.
GET YOUR FREE CONSULTING AND ESTIMATE FOR YOUR PROJECT